A section of lake bank that was under repair collapsed, undermining the pool deck and screen cage foundation of the adjacent residence. Velocity was contacted and responded on an emergency basis. The foundation was temporarily supported using wood blocking and bottle jacks until permanent repairs could be made. Helical piers were later installed to permanently support the screen cage foundation. The pool deck area was then backfilled and the lake bank was stabilized.